Types of Demolition: Scope, Method and Material

Demolition classifies three ways. Scope describes how much of the structure goes. Method describes how it comes down. Material describes what it is made of. A single job carries all three labels at once: a full demolition, carried out mechanically, on a masonry structure.

Free site visit and written quote anywhere in greater Cape Town.

Call 064 582 1436Get a demolition quote

Three demolition scenes side by side showing machine demolition, hand demolition and an interior strip-out
Demolition classifies three ways: by scope, by method and by material.

Types by scope

Scope is the first decision on any demolition, because it sets the permit route and the programme.

Demolition types by scope.
TypeWhat goesStructure stays in use
Total demolitionThe entire structure above groundNo
Demolition to footingsThe structure plus slab, foundations and footingsNo
Partial demolitionA defined portion, such as a wing or an upper storeyPartly
Selective demolitionSpecific elements: a wall, a chimney, a staircaseYes
Interior strip-outNon-structural interior only; the shell staysYes
DeconstructionDismantled in reverse build order to recover materialsNo

Demolition to footings

Demolition to footings takes the structure, the floor slab, the foundations and the footings out of the ground. Standard demolition stops at slab level and leaves the foundations in place. The distinction matters for a rebuild, because new foundations cannot be set on old footings of unknown condition. House demolition covers the strip depth in detail.

Types by method

Method follows from structure height, site access and what surrounds the building.

Demolition methods sets out the plant and the selection logic for each.

Types by material

Material determines the tool, the disposal route and the salvage value.

Demolition by material, with the governing tool and salvage position.
MaterialPrimary toolSalvageDetail
Masonry — brick and blockBreaker, pulveriserFace brick recoverable by handHouse demolition
Concrete — reinforcedBreaker plus rebar shearCrushed for fill; steel to scrapConcrete demolition
Structural steelOxy-cutting, shearHigh — credited against the quoteSteel dismantling
TimberSaw, hand toolsOregon pine carries real valueTimber demolition
Precast concrete panelLifted, not brokenPanels reusable when undamagedVibracrete removal
ThatchHand stripNone; bulky low-density disposalRoof removal
Sheet roofing — IBR, corrugated ironUnscrewed and liftedSheeting resold when soundRoof removal

Types by structure

Every structure below is demolished as its own scope of work, priced separately.

Frequently asked questions

What is the difference between demolition and deconstruction?

Demolition breaks a structure down by force and disposes of the material. Deconstruction dismantles it in reverse build order to recover brick, timber, sheeting and steel for reuse. Deconstruction runs slower per square metre and costs more in labour, offset against the salvage recovered. See reclaimed building materials.

What is selective demolition?

Selective demolition is the controlled removal of specific structural elements while the remainder of the building stays standing and in use. Typical scopes are a single load-bearing wall, a chimney, a staircase or one storey of a multi-storey structure. Temporary support goes in before any load-bearing element is cut. See partial demolition.

What does demolition to footings mean?

Demolition to footings removes the structure, the floor slab, the foundations and the footings from the ground, leaving clean soil. Standard demolition stops at slab level. A rebuild normally requires the footings out, because new foundations cannot be set on old footings of unknown condition.

What is a soft strip?

A soft strip removes all non-structural interior material from a building before the structure itself is touched. Fittings, linings, ceilings, partitions, flooring and services come out, and the shell stays standing. Soft strip precedes most commercial demolitions and is the whole scope of a fit-out removal. See interior strip-out.

Which demolition method is cheapest?

Mechanical demolition costs the least per square metre, because a single machine and operator take down more structure per hour than any hand method. Hand demolition costs the most, and applies where a machine cannot control the drop safely. Site access is the factor that most often forces the more expensive method.